All open projects

You can now provide feedback on these consultations.

Check the close date. This is when the option to make a submission will close for that project.

Longan fruit from Vietnam - (closes 25 February 2019)


National Traceability Project - (closes 23 January 2019)


Mandatory dairy code of conduct - (TBA)


Murray—Darling Basin efficiency measures - additional criteria for on-farm projects - (closes 30 November 2018)


Proposed changes to import conditions for bee products into Norfolk Island - (closes 30 November 2018)


Food safety certification requirements for imported bivalve molluscs - (closes 8 February 2019)


The Seed


You can now provide feedback on these consultations.

Check the close date. This is when the option to make a submission will close for that project.

Longan fruit from Vietnam - (closes 25 February 2019)


National Traceability Project - (closes 23 January 2019)


Mandatory dairy code of conduct - (TBA)


Murray—Darling Basin efficiency measures - additional criteria for on-farm projects - (closes 30 November 2018)


Proposed changes to import conditions for bee products into Norfolk Island - (closes 30 November 2018)


Food safety certification requirements for imported bivalve molluscs - (closes 8 February 2019)


The Seed